After several months of planning and going back and forth, I finally got the new 29 gallon from Ed over at ILC (Ed you are da man!!!!)
I got the tank home and was planning to do the plumbing. Didn't happen. So...several trips to Lowe's later and alot of PVC cement fumes later I came up with this.
The return plumbing goes like this:
Pump to first ball valve (pump is Mag 9.5, will need to ball valve to approx. 75 to 80% and should be good)
Tee feeds the fuge, which can be ball valved back to correct flow (currently closed...no baffles)
Return is 3/4" going to a Sea Swirl (picking that up on Fri...currently going to a Fluval 5/8" return)
Here is the detail for the fuge and return plumbing.
So, did I totally blow this? Is thee a way that I can improve it?
Tom
I got the tank home and was planning to do the plumbing. Didn't happen. So...several trips to Lowe's later and alot of PVC cement fumes later I came up with this.
The return plumbing goes like this:
Pump to first ball valve (pump is Mag 9.5, will need to ball valve to approx. 75 to 80% and should be good)
Tee feeds the fuge, which can be ball valved back to correct flow (currently closed...no baffles)
Return is 3/4" going to a Sea Swirl (picking that up on Fri...currently going to a Fluval 5/8" return)
Here is the detail for the fuge and return plumbing.
So, did I totally blow this? Is thee a way that I can improve it?
Tom