Folks, if you've recently upgraded or renewed your annual club membership but it's still not active, please reach out to the BOD or a moderator. The PayPal system has a slight bug which it doesn't allow it to activate the account on it's own.
Rube Goldberg Bubble Trap Number Four
If you’ve been around long enough, you’ve seen the Rube Goldberg’s I’ve made to stop micro bubbles / salt creep in my sump. They all had some positives, with the last version not too bad, but I still though there was room for improvement. Well I’m now...
It would also be worthwhile to note the brand of two part you are using since they are all different concentrations. I have a 90 gallon DT mixed reef and use Randy's DIY two part (same as BRS two part). I dose 43 mls ALK and 54 mls CALC. I use IO salt (it's the ocean) and am a low baller...
I'm not sure if you folks saw this, but Ecotech has announces a new technology coming out shortly for their pumps.
QuietDrive is new pump technology from Ecotech Marine
Interestinly this "new" technology is at about the same time the patents expire on the current pumps......not to mention...
Here's my thought process....I'm assuming this is a 2 foot cube tank. I have four MP's, but have not owned a Jebao (yet). What I do with my MP's is to never run them close to 100%. They are known to blow their bearings on the dry side, and I believe running them at 60-70% or less, they...
Main beam....although there are situations were it could be drilled.....small holes....especially if it's LVL (laminated), I'd stick to running under the beam and simply boxing it in. I'm assuming you are going with a finished basement. You won't even notice the box in. I did it with the...
Here's the bottom line.....ask your inspector. Since drilling headers is not in the code (wasn't when I read it), it's at the whim of the inspector. I would guess that most inspectors would go with joist code as far as notching and drilling....but again, that is up to how that individual...
Just so we are talking off the same sheet of music.....a header is the support above a door or window.....typically two 2 x 6's (could be 2 x 8's or even 2 x 10's) and a piece of 1/2 inch ply. Might I assume you have no room above the header and top plate? Or why not go to the right or left...