I am going to drill my tank this weekend and I came up with a neat idea and looking for some input. Here is my plan:
The red being to the sump. Standard design.
The blue being the return from the sump. What I would like to to is have this come into the back of the tank behind the rockwork about 2-3" from the bottom of the tank through a 1" bulkhead then attached to the middle of a 1/2" PVC pipe with little vent holes drilled into it running the length of the tank to act as a way of moving the water around behind the rock w/o actually putting a powerhead back there. My sump returns about 600gph max. The tank is 36" long 65gal.
What do you think? Where would I put the air vent to prevent back siphon? <br>
Thanks in advance for your help. Any suggestions are greatly appreciated.
(Sorry for the poor drawing.)

The red being to the sump. Standard design.
The blue being the return from the sump. What I would like to to is have this come into the back of the tank behind the rockwork about 2-3" from the bottom of the tank through a 1" bulkhead then attached to the middle of a 1/2" PVC pipe with little vent holes drilled into it running the length of the tank to act as a way of moving the water around behind the rock w/o actually putting a powerhead back there. My sump returns about 600gph max. The tank is 36" long 65gal.
What do you think? Where would I put the air vent to prevent back siphon? <br>
Thanks in advance for your help. Any suggestions are greatly appreciated.
(Sorry for the poor drawing.)